The Jig Is Up Part Two
[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

The Jig Is Up Part Two



I'll have the second headlight door finished by tuesday. I got a little
behind due to health problems and personal business last week. I just
have to sand the areas to be painted silver and paint it and clear coat
it. I am going to remove the grill tuesday and temporarily hang the turn
signal lights with tie wire so I can drive the car. I figure it will
take a good 10 days to 2 weeks to do the grill. I will make a wooden
frame out of 1"X1" square ballister to screw the frame to at the grills
original mounting points so the grill is easier to hold and since it is
plastic it will be supported and not get broken during the refinishing
process. The snow has cleared up and the roads are dry so today I will
take the car out for a drive. The window tint has been dry for 4 days
now and I can now roll down the windows. I was told it was ok after 2
days but I am always extra careful. I am trying to do as much of the
detail work as possible buy the june 4th Ardsley show. I can't decide
what project to start next. The painting and installation of the 77 AMX
rear window louver which means I have to fix a dent in the hatch and
paint the whole hatch as some time in the past some idiots polished this
car and rubbed the paint down to bare metal in certain areas or strip
and paint the 77 AMX flairs and paint and install them.    
"Doc"








Home Back to the Home of the AMC Gremlin 


This site contains affiliate links for which we may be compensated